Mumbai’s data center capacity is expected to more than double to 2.65 times its current level by 2023.
Mumbai, with a 199 MW IT load capacity, is the country’s leading data center hub, with nine internet cable landing points and a reliable …
Mumbai, with a 199 MW IT load capacity, is the country’s leading data center hub, with nine internet cable landing points and a reliable …
IBM has built what it calls the world’s first 2 nanometer node chip. As process nodes have shrunk into the single digits, the way …
If regulators on both sides of the Atlantic let him close the $40 billion acquisition of Arm Holdings announced Sunday, Nvidia co-founder and CEO Jensen Huang …